New Irrigation Area According to
GAP's Master Plan
|
Project Areas of the Euphrates River Basin |
Irrigated Area (ha) |
|
Sanliurfa-Harran |
141,835 |
|
Mardin-Ceylanpinar (1st stage) |
185,639 |
|
Mardin-Ceylanpinar (2nd stage) |
149,000 |
|
Siverek-Hilvan |
160,105 |
|
Bozova |
69,702 |
|
Suruc-Baziki |
146,500 |
|
Adiyaman-Göksu-Araban |
71,598 |
|
Adiyaman-Kahta |
77,824 |
|
Gaziantep |
89,000 |
|
Project Areas of the Tigris River Basin |
|
|
Tigris Right Bank Irrigation Gravity Irrigation |
52,033 |
|
Tigris Right Bank Pumped Irrigation |
74,047 |
|
Batman |
37,744 |
|
Batman-Hilva |
257,000 |
|
Garzan |
60,000 |
|
Nusaybin |
89,000 |
|
Silopi |
32,000 |
|
Total |
1,693,027 |
Source: http://www.gap.gov.tr/English/Frames/fr5.html